Accessibility Tools

risda
earis
risda
risda
risda
risda
risda
banner-selamat-datang
WELCOME TO THE
OFFICIAL PORTAL OF
RISDA
WELCOME TO THE
NEW OFFICIAL PORTAL OF
RISDA
WELCOME TO THE
NEW OFFICIAL PORTAL OF
RISDA
more informative and
user friendly
more informative and
user friendly
more informative and
user friendly
EARIS02.jpeg
iso.jpg
banner-suararisda.jpeg
Suara RISDA
Suara RISDA
Suara RISDA
Hub Maklumat
Industri Getah Malaysia
Hub Maklumat
Industri Getah Malaysia
Hub Maklumat
Industri Getah Malaysia
protacinsurance.jpeg
protacrisda.jpeg
mpsr03.jpeg
misikhidmatpelanggan.jpeg
previous arrow
next arrow

Media RISDA

LAPORAN PENCAPAIAN PIAGAM PELANGGAN RISDA JANUARI 2009 HINGGA DISEMBER 2009
Bil Piagam Pelanggan RISDA Menepati Masa/Standard
Piagam Pelanggan
Tidak Menepati
Masa/Standard Piagam
Pelanggan
Jumlah Perkhidmatan
Jumlah Menepati Standard % Menepati Standard Jumlah Tidak Menepati Standard % Tidak Menepati Standard
1. Melulus permohonan yang lengkap bagi tanam semula dalam tempoh 14 hari dari tarikh terima. 15,327 99.26 115 0.74 15,442
2. Bayaran bantuan ansuran semasa dari tarikh kebun diperiksa dalam masa 14 hari. 10,467 98.62 147 1.38 10,614
3. Bayaran bantuan ansuran berturut dari tarikh kebun diperiksa dalam masa 12 hari. 44,982 98.75 570 1.25 45,552
4. Memberi maklum balas kepada semua aduan dalam tempoh 7 hari. 78 100 0 0 78

.

Purata Analisa Bayaran Bantuan Ansuran Semasa Terperinci Setakat Disember 2009 - Baja
- Bekalan Baja Dari Tarikh Kebun Diperiksa Dalam Masa 14 Hari
Bil PRD/PRJ RISDA 7 (DR LWT KEBUN) SPS 42 (DR BYR) PK TERIMA (DR SPS 42) JUM (HARI) DR LWT KEBUN
  KPI 10 2 2 14
1. MELAKA 4 0 1 5
2. PERLIS 5 -1 1 5
3. KEDAH 4 38 20 62
4. KELANTAN 8 50 9 16
5. PAHANG 3 30 4 17
6. N. SEMBILAN 5 10 6 21
7. PERAK 8 39 7 55
8. TERENGGANU 5 28 10 43
9. SELANGOR 5 41 59 105
10. JOHOR 6 4 9 19
11. P. PINANG 4 6 22 32
  PURATA 5 22 13 35

 .

Purata Analisa Bayaran Bantuan Berturut Terperinci Setakat Disember 2009 - Baja
- Bekalan Baja Dari Tarikh Kebun Diperiksa Dalam Masa 14 Hari
Bil PRD/PRJ RISDA 7 (DR LWT KEBUN) SPS 42 (DR BYR) PK TERIMA (DR SPS 42) JUM (HARI) DR LWT KEBUN
  KPI 10 2 2 14
1. MELAKA 4 2 2 8
2. PERLIS 4 0 1 5
3. KEDAH 3 38 -4 38
4. KELANTAN 6 48 9 16
5. PAHANG 4 46 5 17
6. N. SEMBILAN 5 38 -12 30
7. PERAK 5 31 6 42
8. TERENGGANU 3 24 10 37
9. SELANGOR 5 35 47 87
10. JOHOR 5 6 8 18
11. P. PINANG 6 8 15 29
  PURATA 4 25 8 30

 .

Purata Analisa Bayaran Bantuan Ansuran Semasa Terperinci Setakat Disember 2009 - Benih
- Bekalan Benih Dari Tarikh Kebun Diperiksa Dalam Masa 15 Hari
Bil PRD/PRJ RISDA 7 (DR LWT KEBUN) SPS 42 (DR BYR) PK TERIMA (DR SPS 42) JUM (HARI) DR LWT KEBUN
  KPI 10 2 3 15
1. MELAKA 4 0 0 4
2. PERLIS 5 4 0 9
3. KEDAH 4 0 1 5
4. KELANTAN 8 5 8 16
5. PAHANG 3 5 9 17
6. N. SEMBILAN 5 3 9 17
7. PERAK 8 5 6 18
8. TERENGGANU 5 8 18 31
9. SELANGOR 5 9 25 39
10. JOHOR 6 3 13 22
11. P. PINANG 4 5 18 27
  PURATA 5 4 10 19